FINAL List of Assessments in the Group 4 Basins for the Verified List of Impaired Waters and Delist List

The department announces the availability of the FINAL lists of assessments for waterbodies and water segments within the Group 4 Basins: Fisheating Creek, Kissimmee, Nassau – St. Marys, Pensacola Bay, Southeast Coast – Biscayne Bay, and Withlacoochee. These lists were adopted by a Secretarial Order signed by DEP Secretary Noah Valenstein, on June 27, 2017.

The FINAL Verified Lists include those waters added to the State’s Verified List of Impaired Waters and will be submitted to EPA as an update to the federal 303(d) list.  The FINAL Delist Lists include those waters that are being removed from the State’s Verified List and will be submitted to EPA as removals from the federal 303(d) list. 

These FINAL assessment lists were produced with water quality and biological data included in the IWR Database Run 53 and reflect several major milestones to the assessment of Florida’s waterbodies.  In particular, the FINAL assessment lists include the revised dissolved oxygen criterion assessed as percent saturation (replacing the assessment of dissolved oxygen as mg/L), and the implementation of numeric nutrient criteria for streams, lakes, springs, and estuaries. In addition, these assessments incorporate new data that has been received by the DEP through data provider uploads to STORET, station-WBID assignment updates, WBID classification updates, and data that have been excluded from assessments based on an evaluation by DEP staff. 

These lists represent the third rotation through the Group 4 basins and another step in the process of restoring impaired waters for these basins.  Now that these lists have been adopted by Secretarial Order, department staff will begin developing TMDLs for waters on the verified list.  A Total Maximum Daily Load (TMDL) represents the maximum amount of pollutant loading that can be discharged to a waterbody and still attain its designated uses.  After TMDL adoption and rule-making, the next step in this process will be the development, by watershed stakeholders and DEP, of a Basin Management Action Plan (BMAP).  The BMAP will specify the activities, schedule, and funding sources that point and nonpoint source dischargers will undertake to restore the waterbody.

The next rotation through these basins is scheduled to begin in July 2021.

For best results, print on legal size paper (8.5 x 14).

2017 Final Verified Lists (MSExcel)

Date

Basin

6/27/2017

Fisheating Creek

6/27/2017

Kissimmee

6/27/2017

Nassau – St. Marys

6/27/2017

Pensacola

6/27/2017

Southeast Coast – Biscayne Bay

6/27/2017

Withlacoochee

2017 Final Lists of Waters to be Delisted from the Verified List and Federal 303(d) List (MSExcel)

Date

Basin

6/27/2017

Fisheating Creek

6/27/2017

Kissimmee

6/27/2017

Nassau – St. Marys

6/27/2017

Pensacola

6/27/2017

Southeast Coast – Biscayne Bay

6/27/2017

Withlacoochee

Last Modified: Wednesday, Mar 22, 2023 - 12:36pm