The Application for Air Permit – Long Form is to be used to apply for:

  • an initial, revised, or renewal Title V air operation permit;
  • an initial federally enforceable state air operation permit (FESOP); or
  • an air construction permit for one or more of the following situations:
    • a proposed modification of a facility currently operating under a FESOP or a Title V air operation permit;
    • a proposed project subject to prevention of significant deterioration (PSD) review, nonattainment area (NAA) new source review, or maximum achievable control technology (MACT);
    • any source where the applicant is proposing to assume a restriction on the potential emissions of one or more pollutants to escape a federal program requirement such as PSD review, NAA review, Title V, or MACT; or
    • any source where the applicant is proposing to establish, renew or revise a plant wide applicability limit (PAL). 

Also, this form is to be used to apply for both an air construction permit and a revised or renewal Title V air operation permit incorporating the proposed project if requesting optional concurrent processing of both applications.

For a list of permit application fees, refer to Rule 62-4.050, F.A.C.

Note: Instead of using this Application for Air Permit – Long Form, you have the option of using the Electronic Permit Submittal and Processing System (EPSAP) to submit your application information electronically.

Form Number: 
62-210.900(1), F.A.C.
Effective-Revision Date: 
Thursday, June 22, 2017
Last Modified: Sunday, Nov 03, 2024 - 02:28pm